After living in our home for three years our master bathroom was the last to get updated. After renovating the main floor and kitchen I had to be a little more conservative on how much I could spend. I liked the layout of the bathroom, it just needed a little updating.
the before:
I had someone tear out the bathroom floor tile, as well as the cultured marble surround in the tub/shower. I replaced with Lowe's tile and stone accents, using a combination of several different patterns.
I had the cabinet doors replaced; however, kept the drawers the same and had it all painted gray by the same painter I used for my kitchen cabinet makeover. Marble counter tops, new square sinks, sink faucets, and light fixtures helped to dress up the space. I painted the entire bathroom white and added molding to the large existing mirror that extends over both sinks. We removed the old framed glass shower door and had a new frame less one installed.
It feels so clean and fresh now!
the after:
I completed both our master bath and my kid's bath at the same time, totalling about $7K for both.
I LOVE the final look Trisha! I saw it in stages and now is nice to see it all completed. While the original bathroom was nice, what you have accomplished is a world apart. Takes it to a whole new level. Awesome job! xo Mom
ReplyDeletelove the bathroom...
ReplyDeletedo you have two light fixtures over the sink.... just asking
Donna, there are two sinks and a light over each sink. :)
ReplyDelete